- Events
- 20by event date
- Control clauses
- 4status on 3 Nov 2026
- Capital rows
- 8a count of rows, not of money3 of them are parts of a package
- Designations
- 2standing, not money
- Projects
- 5registry records3 with no designation
- Non-binding indications
- 1listed apart from capital rows
- Envelopes, appropriations and lending authorities
- 1listed apart from capital rows
- Programmes
- 4named by these rows
- Organizations
- 9named by these rows
- Sources
- 39cited by these records
Supply chain, stage by stage
Gallium's row of the lattice: what the record places at each stage. Counts are records per stage, never money; a record coded to several stages is counted at each, so the stages have no total. The last column holds records that name Gallium and record no stage, so the lattice cannot place them.
- ExplorationExplorationNone recorded
- MiningMining2 commitmentsUS1 designationEU
- SeparationSeparationNone recorded
- ProcessingProcessing6 commitmentsAU US1 clauseCN1 designationEU
- RefiningRefining3 commitmentsAU US1 clauseCN
- Component manufacturingComponents2 commitmentsUS
- RecyclingRecycling1 designationEU
- Research and developmentR&DNone recorded
- Cross-cuttingCross-cuttingNone recorded
- No stage recordedNo stage3 clausesCN US
Records by stage
Mining
Capital rows
up to USD 277 million
As stated: direct funding awards (the “Direct Funding”) with a maximum award amount of $277.0 million in the aggregateInstrument not specified. Contracted, status date 3 Jun 2026.
- Part: Instrument not specified, up to USD 132 million; not added again Open row
up to USD 1.3 billion
As stated: to guarantee the repayment by USAR and its affiliates of advances in an aggregate principal amount of $1.3 billion (“FFB Advances” and, together with the Direct Funding, the “Awards”) made by the Federal Financing BankLoan guarantee. Contracted, status date 3 Jun 2026.
- Part: Loan guarantee, up to USD 550 million; not added again Open row
Control clauses
None
Designationsstanding, not money
Strategic Projects under the Critical Raw Materials Act (European Union). Recognized, status date 25 Mar 2025. Standing, not money.
Holder: European Bauxites, Metlen Energy and Metals
Names: Gallium
Also names: bauxite/alumina/aluminium, not a tracked material
Project record also names: bauxite/alumina/aluminium, not a tracked material
Project registry
Locations: Greece
Sponsors: European Bauxites, Metlen Energy and Metals
Processing
Capital rows
up to USD 200 million
As stated: up to USD$200 million in concessional equity finance for the projectEquity. Announced, status date 20 Oct 2025.
No amount stated
Offtake. Announced, status date 20 Oct 2025.
No amount stated
Tax credit. Authorized, status date 14 Feb 2025.
No amount stated
Equity. Announced, status date 20 Oct 2025.
up to USD 277 million
As stated: direct funding awards (the “Direct Funding”) with a maximum award amount of $277.0 million in the aggregateInstrument not specified. Contracted, status date 3 Jun 2026.
- Part: Instrument not specified, up to USD 132 million; not added again Open row
up to USD 1.3 billion
As stated: to guarantee the repayment by USAR and its affiliates of advances in an aggregate principal amount of $1.3 billion (“FFB Advances” and, together with the Direct Funding, the “Awards”) made by the Federal Financing BankLoan guarantee. Contracted, status date 3 Jun 2026.
- Part: Loan guarantee, up to USD 550 million; not added again Open row
Control clauses
Show all 1
MOFCOM/GACC Announcement No. 23 (2023)
In force on 3 Nov 2026In force, status date 1 Aug 2023
Covered items (goods) belong here. That places the items, not a claim that the clause restricts this stage.
Designationsstanding, not money
Show all 1
Strategic Projects under the Critical Raw Materials Act (European Union). Recognized, status date 25 Mar 2025. Standing, not money.
Holder: European Bauxites, Metlen Energy and Metals
Names: Gallium
Also names: bauxite/alumina/aluminium, not a tracked material
Project record also names: bauxite/alumina/aluminium, not a tracked material
Project registry
Locations: Greece
Sponsors: European Bauxites, Metlen Energy and Metals
Refining
Capital rows
No amount stated
Tax credit. Authorized, status date 14 Feb 2025.
up to USD 277 million
As stated: direct funding awards (the “Direct Funding”) with a maximum award amount of $277.0 million in the aggregateInstrument not specified. Contracted, status date 3 Jun 2026.
- Part: Instrument not specified, up to USD 132 million; not added again Open row
up to USD 1.3 billion
As stated: to guarantee the repayment by USAR and its affiliates of advances in an aggregate principal amount of $1.3 billion (“FFB Advances” and, together with the Direct Funding, the “Awards”) made by the Federal Financing BankLoan guarantee. Contracted, status date 3 Jun 2026.
- Part: Loan guarantee, up to USD 550 million; not added again Open row
Control clauses
MOFCOM/GACC Announcement No. 23 (2023)
In force on 3 Nov 2026In force, status date 1 Aug 2023
Covered items (goods) belong here. That places the items, not a claim that the clause restricts this stage.
Designationsstanding, not money
None
Component manufacturing
Capital rows
up to USD 277 million
As stated: direct funding awards (the “Direct Funding”) with a maximum award amount of $277.0 million in the aggregateInstrument not specified. Contracted, status date 3 Jun 2026.
- Part: Instrument not specified, up to USD 132 million; not added again Open row
up to USD 1.3 billion
As stated: to guarantee the repayment by USAR and its affiliates of advances in an aggregate principal amount of $1.3 billion (“FFB Advances” and, together with the Direct Funding, the “Awards”) made by the Federal Financing BankLoan guarantee. Contracted, status date 3 Jun 2026.
- Part: Loan guarantee, up to USD 550 million; not added again Open row
Control clauses
None
Designationsstanding, not money
None
Recycling
Capital rows
None
Control clauses
None
Designationsstanding, not money
Strategic Projects under the Critical Raw Materials Act (European Union). Recognized, status date 9 Oct 2026. Standing, not money.
Holder: CMK s.r.o.
Names: Gallium
Project registry
Locations: Slovakia
Sponsors: CMK s.r.o.
No stage recorded
These name Gallium but record no stage, so the lattice cannot place them.
Control clauses
Announced on 3 Nov 2026Announced, status date 9 May 2025
By rule: this kind of clause defines no items of its own, so it has no stage.
MOFCOM Announcement No. 46 (2024)
Suspended on 3 Nov 2026Suspended, status date 9 Nov 2025
Records no stage.
In force on 3 Nov 2026In force, status date 3 Jun 2026
Records no stage.
None recorded at: Exploration, Separation, Research and development, Cross-cutting.
A designation is a government's recognition of a project under a named scheme. It records standing, not money, and covers only the stages and materials the designation names. A project is the registry record of the site or venture. Shared stage codes are not a finding.
Registry projects with no designation naming Gallium
Not placed by stage: a project's own stage list is not a designation, and the lattice places only designations.
- Alcoa-Sojitz Gallium Recovery Project
Locations: Wagerup, Western Australia
Project record codes: processing. Registry stages, not placed on the supply-chain lattice.
3 capital rows name this project: Australian Government to Alcoa-Sojitz Gallium Recovery Project; Australian Government to Alcoa-Sojitz Gallium Recovery Project; United States Government to Alcoa-Sojitz Gallium Recovery Project
- Trail Strategic Metals Initiative
Locations: Trail Operations in British Columbia
Sponsors: Teck Resources Limited
Project record codes: processing, refining. Registry stages, not placed on the supply-chain lattice.
1 capital row names this project: Canada Growth Fund to Teck Resources Limited
- Round Top Mine Project
Locations: Sierra Blanca, Texas
Sponsors: USA Rare Earth, Inc.
Project record codes: mining, processing. Registry stages, not placed on the supply-chain lattice.
2 capital rows name this project: U.S. Department of Commerce to USA Rare Earth, Inc.; U.S. Department of Commerce to USA Rare Earth, Inc.
Capital and controls
Each capital row is shown at its own amount, in its own currency, exactly as the record states it. Nothing here adds up, splits or converts an amount, so a row that names several materials shows its whole amount and a part sits inside its package without being added again.
Capital rows (10 naming Gallium; 8 shown at top level, 2 inside a package)
Public commitments (8)
Committed to a recipient by a government or public enterprise, at the status each row states. A contracted, partially disbursed or disbursed row is binding because an agreement is executed; payment is tracked separately by status. A contracted row need not mean funds are obligated or paid, and a partially disbursed row is not fully paid.
Provider: Australian GovernmentRecipient: Alcoa-Sojitz Gallium Recovery Project
up to USD 200 million
As stated: up to USD$200 million in concessional equity finance for the projectEquity. Announced, status date 20 Oct 2025.
Not yet binding.
Scope: names Gallium only.
- Part of Australian Government, which does not name Gallium
Provider: U.S. Department of CommerceRecipient: USA Rare Earth, Inc.
up to USD 277 million
As stated: direct funding awards (the “Direct Funding”) with a maximum award amount of $277.0 million in the aggregateInstrument not specified. Contracted, status date 3 Jun 2026.
Binding: an agreement is executed; payment is tracked separately. Authority as stated: CHIPS Act of 2022.
Scope: names 5 materials; the amount is not divided.
Part: Instrument not specified, up to USD 132 million; not added again
Provider: U.S. Department of CommerceRecipient: USA Rare Earth, Inc.
up to USD 132 million
As stated: (a) $132.0 million for the construction of a rare earth mining and processing facility in Sierra Blanca, TexasInstrument not specified. Contracted, status date 3 Jun 2026.
Binding: an agreement is executed; payment is tracked separately.
Scope: names 4 materials; the amount is not divided.
Provider: U.S. Department of CommerceRecipient: USA Rare Earth, Inc.
up to USD 1.3 billion
As stated: to guarantee the repayment by USAR and its affiliates of advances in an aggregate principal amount of $1.3 billion (“FFB Advances” and, together with the Direct Funding, the “Awards”) made by the Federal Financing BankLoan guarantee. Contracted, status date 3 Jun 2026.
Binding: an agreement is executed; payment is tracked separately. Authority as stated: CHIPS Act of 2022.
Scope: names 5 materials; the amount is not divided.
Part: Loan guarantee, up to USD 550 million; not added again
Provider: U.S. Department of CommerceRecipient: USA Rare Earth, Inc.
up to USD 550 million
As stated: (a) $550.0 million for the Round Top Mine ProjectLoan guarantee. Contracted, status date 3 Jun 2026.
Binding: an agreement is executed; payment is tracked separately.
Scope: names 4 materials; the amount is not divided.
Provider: Australian GovernmentRecipient: Alcoa-Sojitz Gallium Recovery Project
No amount stated
Offtake. Announced, status date 20 Oct 2025.
Not yet binding.
Scope: names Gallium only.
Provider: Australian GovernmentRecipient: Constitutional corporations with registered CMPTI processing activities
No amount stated
Tax credit. Authorized, status date 14 Feb 2025.
Not yet binding. Authority as stated: Future Made in Australia (Production Tax Credits and Other Measures) Act 2025 (Act No. 9 of 2025), Schedule 2, inserting Division 419 into the Income Tax Assessment Act 1997.
Scope: names 13 materials; the amount is not divided.
Provider: United States GovernmentRecipient: Alcoa-Sojitz Gallium Recovery Project
No amount stated
Equity. Announced, status date 20 Oct 2025.
Not yet binding.
Scope: names Gallium only.
Non-binding indications (1)
Non-binding letters of intent or interest that name an amount: possible support, not a commitment, capital or a backer.
Provider: Canada Growth FundRecipient: Teck Resources Limited
up to CAD 400 million
As stated: up to $400 millionInstrument not specified. Announced, status date 7 Jul 2026.
Not yet binding. Authority as stated: Canada Critical Minerals Accelerator.
Scope: names 3 materials; the amount is not divided.
Envelopes, appropriations and lending authorities (1)
Ceilings that awards are drawn from. An award is never a division of its envelope.
Provider: Australian Government
AUD 1.2 billion
As stated: $1.2 billion Critical Minerals Strategic ReserveSeveral instruments, split not stated. Announced, status date 12 Jan 2026.
Not yet binding.
Scope: names 3 materials; the amount is not divided.
Control clauses (4, status on 3 Nov 2026)
Announced on 3 Nov 2026
Announced, status date 9 May 2025
- Announced, status date 9 May 2025
MOFCOM/GACC Announcement No. 23 (2023)
In force on 3 Nov 2026
In force, status date 1 Aug 2023
- Scheduled, status date 3 Jul 2023, until 1 Aug 2023
- In force, status date 1 Aug 2023
Covered items (goods) belong at refining, processing. That places the items; it is not a claim that the clause restricts that stage.
Legal basis: Export Control Law of the People's Republic of China
MOFCOM Announcement No. 46 (2024)
Suspended on 3 Nov 2026
Suspended, status date 9 Nov 2025
- In force, status date 3 Dec 2024
- Suspended, status date 9 Nov 2025, until 27 Nov 2026
Legal basis: Export Control Law of the People's Republic of China
In force on 3 Nov 2026
In force, status date 3 Jun 2026
- In force, status date 3 Jun 2026
Explore capital rows naming Gallium and control clauses naming Gallium: all rows naming Gallium, parts and options listed separately.
Timeline
One dot for each event, placed at its event date as coded. Capital-row and clause status dates are not plotted: a status with no date has no honest position, and an event date is never used in its place.
Dates stated after the as-of: 27 Nov 2026 (control clause ctl-cn-us-2024-gallium-germanium-antimony-denial).
Newest events
- EUCommission Decision recognising 46 critical raw material projects in the EU as Strategic Projects under the Critical Raw Materials Act
- CACanada Growth Fund and Teck strategic investment framework for Trail strategic metals expansion
- USCommerce's CHIPS Program letter of intent with USA Rare Earth, and the funding and loan guarantee agreements that followed
- USAdjusting Imports of Processed Critical Minerals and Their Derivative Products Into The United States
- AUCritical Minerals Strategic Reserve — initial minerals
- GBVision 2035: Critical Minerals Strategy
Events (20)
Policy status across actors
Where each actor's coded measures on this material currently stand.
Commission Decision recognising 46 critical raw material projects in the EU as Strategic Projects under the Critical Raw Materials Act
UnclearRecords under this event: 1 designation.
Canada Growth Fund and Teck strategic investment framework for Trail strategic metals expansion
ActiveRecords under this event: 1 capital row.
Commerce's CHIPS Program letter of intent with USA Rare Earth, and the funding and loan guarantee agreements that followed
ActiveRecords under this event: 4 capital rows, 1 control clause.
Critical Minerals Strategic Reserve — initial minerals
ActiveRecords under this event: 1 capital row.
United States–Australia Framework for Securing of Supply in the Mining and Processing of Critical Minerals and Rare Earths
ActiveRecords under this event: 3 capital rows.
National Export Control Coordination Mechanism Office deploys special campaign against smuggling and illegal export of strategic minerals
ActiveRecords under this event: 1 control clause.
Commission Decision recognising 47 critical raw material projects in the EU as Strategic Projects under the Critical Raw Materials Act
In forceRecords under this event: 1 designation.
Future Made in Australia (Production Tax Credits and Other Measures) Act 2025
In forceRecords under this event: 1 capital row.
MOFCOM Announcement No. 46 of 2024 on strengthening export controls of dual-use items to the United States
ActiveRecords under this event: 1 control clause.
MOFCOM/GACC Announcement No. 23 of 2023 on export controls on gallium- and germanium-related items
ActiveRecords under this event: 1 control clause.
Resilience for the Future: The United Kingdom's Critical Minerals Strategy
SupersededSuperseded by Vision 2035: Critical Minerals Strategy.
Editorial notes (not coded records)
Written summaries kept from the earlier page, not coded records. A summary appears only if it passed review against the records above; the downstream-use list is exempt from that review and has not been checked against a source.
Typical downstream uses
- GaAs / GaN semiconductors
- Radar and defense electronics
- LEDs
- Photovoltaics