← Capital
USUnited StatesU.S. Department of Energy, ATVM Loan Program (Federal Financing Bank lending arrangements)

Lithium Nevada LLC (formerly Lithium Nevada Corp.)

Thacker Pass Phase 1 lithium carbonate processing facilities

CommitmentLoanPublicPartially disbursed

fin-us-doe-thacker-pass-atvm-2024

Reading this record

What the evidence says — and does not say

What kind of figure?
CommitmentMoney, or a money-like promise, committed to a named recipient or project. The only role ever summed.
What has happened legally?
Partially disbursedSome of the money has been paid out.
Has money been paid?
Follow the payment evidenceThe source-linked current status records partial payment. It does not establish that the full stated amount was paid or that construction occurred.
What does it link to?
Project attributionOne registered project is linked directly to this row. The link alone does not prove the amount was paid or that the project advanced.

This is a commitment role, but the financial status still determines legal standing and payment. Funding and verified industrial outcomes remain separate. A financial record alone never independently verifies construction, commissioning or production. Read SMPT's counting and evidence rules.

Amount

aboutUSD2.23 billion

As stated “$2.23 billion amended expected loan amount ($1.97 billion principal plus approximately $256 million capitalized interest)”

USD 2,230,000,000 · Approximately · Currency stated in the source

Record

Provider
U.S. Department of Energy, ATVM Loan Program (Federal Financing Bank lending arrangements)U.S. Department of EnergyGovernment body
Legal authority
Energy Independence and Security Act of 2007 — Advanced Technology Vehicles Manufacturing (ATVM) Loan Program
Programme
None named
Recipient
Lithium Nevada LLC (formerly Lithium Nevada Corp.)Lithium Nevada LLCCompany
Project
Thacker Pass Phase 1 lithium carbonate processing facilitiesThacker Pass Phase 1 lithium-carbonate processing facilities capital stack →
Facility
Thacker Pass Phase 1 processing plant and associated infrastructure
Location
Thacker Pass, Humboldt County, NevadaUS
Stages
ProcessingSingle stage
Materials
LithiumTracked materials only

Status

Financial and physical progress are separate histories. The last entry is current.

Financial

  1. Contracted

    Executed ATVM Loan Arrangement and Reimbursement Agreement No. A1034 on 28 October 2024, originally naming Lithium Nevada Corp. Original approx. $2.26B face amount was later revised; no draw inferred from closing.

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

  2. Partially disbursedcurrent

    First $435M DOE-loan advance received on 20 October 2025. Issuer's 2026 Q2 filing confirms subsequent draws of $432M (24 February 2026) and $342M (3 June 2026), totaling $1.209B advanced by 30 June 2026. These are draws under the same facility, not additive commitments.

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

Implementation

  1. Constructioncurrent

    Issuer's quarter-ended 30 June 2026 report confirms active major construction of Thacker Pass Phase 1 processing plant, $1.6217B cumulative Phase 1 construction costs within the technical-report capital-expenditure estimate and targeting late-2027 mechanical completion. No commissioning or operating output is evidenced.

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

Notes

Single DOE ATVM/FFB loan, No. A1034. The original 28 October 2024 closing was approximately $2.26B ($1.97B principal plus an estimated $289.6–$289.7M capitalized interest); the 7 October 2025 amendment reduced estimated interest to $256M, making the amended total approximately $2.23B. These are versions of the same facility, not two commitments; the current amount is approximate ($1.97B + $256M = $2.226B before rounding). The schema holds a current amount and financial-status history, not historically versioned amounts: an as-of 2024 report must not present $2.23B as the contemporaneous 2024 face amount. Cumulative advances were $435M on 2025-10-20, $867M after 2026-02-24, and $1.209B after 2026-06-03; the $1.209B is not additional finance and is different from the $988.018M accounting carrying value after deferred issuance costs/interest. Original legal borrower Lithium Nevada Corp. is now Lithium Nevada LLC, distinct from its Canadian-listed sponsor Lithium Americas Corp. DOE loan supports lithium-carbonate processing infrastructure (including a sulfuric-acid plant), not open-pit mine development. Q2 2026 supports construction only; no operational production. DOE's 2025 equity warrants, GM equity and private financing are not classified as draws or additional DOE commitments. F4-A amount-history pilot retains original ~$2.26B effective from 2024-10-28. The ~$2.23B amendment was signed on 2025-10-07 subject to conditions and is proven effective no later than first advance on 2025-10-20; the precise transition date within October 7–19 is not evidenced. This is not a draw-history or historical aggregate.

Evidence

Every populated field names the source that states it, how directly, and where.

  1. Thacker Pass — DOE Loan Programs Office project and financial summary

    U.S. Department of Energy, Loan Programs Office

    Fields supported
    Instrument · Value role · Capital source · Amount · Provider · Recipient · Project · Facility · Location · Supply-chain stages · Materials
    Evidence level
    Explicit
    Location in document
    Project summary; Financial summary and Loan type
    Qualification
    DOE October 2024 baseline is about $2.26B including capitalized interest. The bank project page has not been updated for the Oct 2025 amendment and is not used as the current amount.
    View source dossier →
  2. EIS-0561 Thacker Pass loan: DOE processing-facility-only scope and 28 October 2024 decision

    U.S. Department of Energy

    Fields supported
    Legal authority · Project · Facility · Location · Supply-chain stages · Materials
    Evidence level
    Explicit
    Location in document
    DOE/EIS-0561 Summary; loan restricted to processing facilities and associated infrastructure, not open-pit mine
    Qualification
    Constrains funded project and single-stage processing attribution.
    View source dossier →
  3. Lithium Americas, Exhibit 10.11 — 28 October 2024 ATVM Loan Arrangement and Reimbursement Agreement

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

    Fields supported
    Instrument · Value role · Capital source · Provider · Legal authority · Recipient · Project · Status
    Evidence level
    Explicit
    Location in document
    Cover, Preliminary Statements, and agreement parties; 28 October 2024
    Qualification
    Legal contract names DOE and Lithium Nevada Corp. borrower. Contract scope is executed loan arrangement with Federal Financing Bank advance mechanics.
    View source dossier →
  4. Lithium Americas, Exhibit 10.1 — 7 October 2025 omnibus DOE loan amendment

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

    Fields supported
    Provider · Recipient · Status
    Evidence level
    Explicit
    Location in document
    Opening paragraph: Lithium Nevada LLC (formerly Lithium Nevada Corp.) as Borrower; 7 October 2025 OWCA
    Qualification
    This is an amendment to the 2024 loan, not a separate second loan; corporate name continuity is express.
    View source dossier →
  5. Lithium Americas Corp., Form 10-Q for the quarter ended 30 June 2026

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

    Fields supported
    Amount · Recipient · Project · Facility · Location · Supply-chain stages · Materials · Status
    Evidence level
    Explicit
    Location in document
    Note 4 — Department of Energy Loan Facility; MD&A pp. 23–28 and 'Borrowings under the DOE ATVM Loan Program'
    Qualification
    Issuer states October 2025 amended expected facility $2.23B and the dates/amounts of all three advances; separately verifies ongoing Phase 1 processing-plant construction.
    View source dossier →
  6. Lithium Americas Form 8-K — 7 October 2025 DOE amendment subject to conditions

    Lithium Americas Corp. / U.S. Securities and Exchange Commission (EDGAR)

    Fields supported
    Amount · Status
    Evidence level
    Explicit
    Location in document
    Form 8-K Item 1.01 and Exhibit 99.1
    Qualification
    Source establishes signed conditional amendment and approximately $2.23B proposed revised total, not October 7 effectiveness.
    View source dossier →